Understanding The ISO/TS
16949:2002 Standard
7.3
Purchasing
7.4.1 Purchasing
Process
Your organization
shall:
Ensure that purchased
product conforms to specified purchase
requirements
Base the type and
extent of control of your supplier and purchased product, upon
the effect the purchased product has on your subsequent product
realization and final product
Evaluate and select
suppliers on their ability to supply you with product in
accordance with your requirements
Establish criteria for
the selection, evaluation and re-evaluation of
suppliers
Maintain records of
evaluation results and actions
Note 1
: Purchased product includes all
products & services that affects customer - sub-assemblies,
sequencing, sort, rework & calibration
services
Note 2
: Verify the continuity of your
supplier’s QMS & its effectiveness if there are merger,
acquisition, affiliations associated with your
suppliers.
7.4.1.1 Regulatory
Conformity
Purchased product
or materials shall conform to applicable regulatory
requirements
7.4.1.2
Supplier QMS
development
Develop your
suppliers to conform to TS 16949. As a first step, they shall
be ISO 9001 certified, unless otherwise specified by your
customer.
Note:
Prioritize supplier development based on their quality
performance & importance of product
supplied.
7.4.1.3
Customer-approved
sources
Where specified by
contract (customer drawing or specification), you shall
purchase products, materials, tool/gauge and services from
approved sources.
Using customer
designated supplier, including tool/gauge suppliers does not
relieve your organization of the responsibility to ensure the
quality of purchased product.
Key Explanation Points and
Tips:
Þ
Clause 7.4 covers the following purchasing
activities:
Þ
Requirements to control purchased product (clauses
7.4.1; 7.4.1.1; 7.4.3; 7.4.3.1)
Þ
Requirements to control suppliers you buy from (7.4.1;
7.4.1.2; 7.4.1.3; 7.4.3.2
Þ
Requirements controlling your buying process
(7.4.2)
Þ
Purchased product includes raw materials, components,
subassemblies, supplies, tooling, machinery and equipment,
sequencing, sorting, rework, testing, calibration, maintenance,
etc.
Þ
Note that clause 7.4 requirements also apply to customer
provided property which might include materials, production
equipment; tooling; measuring and test equipment; facilities;
transport vehicles; returnable packaging; intellectual property
(drawings, specifications or proprietary information); product
returned for servicing under warranty, product sent for
outsourced work; etc.
Þ
You must have specifications/criteria for purchased product.
These specifications may come from your organization, customer,
regulatory bodies, supplier or industry. As documents, these
specifications must be controlled as per clause
4.2.4
Þ
Many times the customer may require the use of pre-approved
purchased products and suppliers. The onus is still on you to
ensure that purchased product from customer-designated sources
meets all requirements.
Þ
You must control both, the product that you buy, as well as the
supplier you buy from. Clauses 7.4.3 and 7.4.3.1 and 7.3.6.3
PPAP deal with requirements to control the products you buy.
Your controls must primarily be based on prevention of
nonconformities in both product and supplier
performance.
Þ
And clauses 7.4.1(second paragraph), 7.4.1.2; 7.4.1.3; 7.4.2c;
7.4.3.2 and 7.3.6.3 PPAP deal with requirements to control the
suppliers you buy from.
Þ
Determine how important the purchased product is to design,
manufacture, assemble and maintain your end product. Keep in
mind clause 7.3.2.1 which requires targets for product quality,
life, reliability, durability, maintainability, timing and
cost. You must apply similar criteria to purchased product
going into your end product.
Þ
Categorize your purchased products accordingly. Then determine
what controls you need to ensure consistent purchased product
quality and consistent supplier performance. You can apply
different controls for different purchased products and
suppliers.
Þ
Besides product quality, your criteria for supplier selection
and evaluation may include the potential supplier’s - financial
capability; technical and manufacturing capability and
capacity; reliability; reputation; flexibility to handle
changes; support; service; cost; etc. The importance of these
criteria will vary according to the items materials or services
you purchase, and so you can apply different criteria to
different supplies. You can categorize your suppliers
accordingly based on these criteria. It might be useful to
maintain a list of all qualified suppliers.
Þ
Not all suppliers of purchased product need to conform to TS
16949. Look at the importance of the purchased product and
their quality performance, to qualify them and prioritize their
QMS development. Supplier - refers to your suppliers
manufacturing site where production and/or service parts
are made.
Þ
You must promote and encourage your qualified or key suppliers
to develop their QMS - starting with registration by an
accredited 3rd party Certification Body (CB) to ISO
9001:2000 (unless, otherwise specified by the customer) and
eventually leading to conformity to the latest TS 16949
standard. Your supplier QMS development process could
include a
plan for qualified suppliers to achieve ISO
certification and TS conformity within the 3 year life
cycle of your organization’s registration
certificate.
Þ
If supplier development according to the above plan is not
possible, then get approval in writing from affected
customers for an alternate approach to supplier development,
e.g. assessment by a OEM customer approved second party. Very
small supplier organizations may obtain special dispensation
from their OEM customers from obtaining ISO 9001 or TS 16949
certification under certain conditions. Please review specific
requirements for subcontractor development at OEM customer or
IATF websites.
Þ
Where there are multiple customers for a purchased part or
supplier, you must ensure that your purchased part and supplier
meet all specific customer requirements (e.g. PPAP
requirements).
Þ
Where OEM customer approved suppliers are used, you must still
apply all applicable TS 16949 control requirements to manage
these suppliers. Also review specific requirements for customer
approved suppliers at OEM customer or IATF websites.
Þ
As per clause 4.1, you must identify your purchasing processes
whether on site or off site. For each process, you must
document the controls for purchased product and suppliers. You
must also show the linkage and interaction of purchasing
processes with other processes such as design, manufacturing,
tooling maintenance, calibration, etc.
Þ
Where any of your controlled suppliers have gone through a
significant organizational change (mergers, acquisitions, etc),
you must verify (e.g. get a copy of their latest ISO 9001
certification) the continuity and effectiveness of their QMS.
Þ
You must keep records of all supplier evaluations (whether
initial or periodic), including any corrective actions placed
on them for any nonconformities.
Þ
Performance indicators (to measure the effectiveness of
purchasing processes in meeting requirements and achieving
quality objectives) should focus on measuring supplier
performance and
reducing variation in and improving purchasing p
rocesses and related use of resources.
Þ
Indicators for supplier performance may include –
reduction of defects in supplied product; scrap; waste and
rework; improvement in on-time delivery, service, cost, etc.
Indicators for purchasing process may include reduction in
supplier – quote review cycle time; contract award cycle time;
purchase order-entry errors and omissions; receiving errors
& omissions; etc.
Þ
For performance indicators on supplier communications
processes, see clause 5.5.3 first paragraph of key explanation
points and tips.
|